Skip to main content

Artefact projects · Solid · Artefact

Building an arch from a hanging chain: a maths EPQ idea

A title to start from

Can a model arch shaped by a hanging chain carry more load than a semicircular arch?

A starting point, not your title. Change the case, the data or the comparison until it is yours, then agree it with your supervisor. Check your title.

Why it works as an EPQ

The artefact is two model arches; the catenary mathematics predicts which is stronger, and tests decide.

Scope and difficulty

Solid. Solid. Small models, safe loads, repeated tests.

The maths

Builds on these A Level topics: Exponentials and logarithms · Forces and Newton's laws · Coordinate geometry.

You would learn:

Learning maths beyond the course is expected in a maths EPQ, but you must understand and explain everything you use.

One possible plan

  1. Explain why an inverted hanging chain gives an arch in pure compression.
  2. Make templates for both shapes from measured curves.
  3. Build and load-test both, with repeats.
  4. Evaluate results against the theory.

Pitfalls

Where to start reading

Prefer books, lecture notes, journal articles and official data to a single website, and record every source as you read (how to reference).

Making something? Read the artefact guide first: an artefact still needs a research-based written report.

Similar ideas

All artefact projects ideas · all 93 ideas

Your EPQ must be your own work. These pages coach: ideas, structure, checklists and planning. Submitting text, proofs, code or analysis written by someone else or by an AI tool as your own is malpractice. How to use help and AI honestly.

The Extended Project Qualification is offered by several awarding bodies, including AQA, Pearson Edexcel, OCR and WJEC/Eduqas. A Level Math Revision is independent and is not affiliated with or endorsed by any awarding body or university. Summaries of the rules are in our own words: your school and your board's specification have the final say. Every idea here is our own.